Worldwide Project Consortium

Steder Group team up with Mammoet to move oversized and heavy Spudcans

Nov 16, 2016

On behalf of a renowned Belgium Offshore Marine Engineering Co., both Steder Group and Mammoet companies joined forces to move four spudcan shoes, each 220 ton in weight, from the supplier premises via the Dutch inner waterways to a ship yard in the Rotterdam area, for installing the shoes onto a jack up vessel.

Both teams cooperated closely for this flawless operation.

 

www.stedergroup.com
www.wwpc.eu.com

deme-optie2_a deme-optie2_b deme-optie2_d

 

crossmenuchevron-leftchevron-right